I've been tasked with cabling a 8000sq/ft office space for my company. There will be 60 total cat6 drops that will all terminate in a server room into punch panels. I've done installs like this before, just smaller in scale. I'm comfortable pulling cable through walls, punching down and the like.
*However* I'm wondering if anyone has any pointers on how to go about this as I am unfamiliar with a job of this scale.
Are there any considerations with cable routing in crawlspace or drop ceilings? All of my cable runs, save for the termination point to the server room, are in crawlspace or above drop ceilings.
The cable I've ordered is plenum rated, so I'm assuming using J hooks and velcro straps like I have in the past is the way to go?
I'm curious to know if anyone has had similar experiences =]
*However* I'm wondering if anyone has any pointers on how to go about this as I am unfamiliar with a job of this scale.
Are there any considerations with cable routing in crawlspace or drop ceilings? All of my cable runs, save for the termination point to the server room, are in crawlspace or above drop ceilings.
The cable I've ordered is plenum rated, so I'm assuming using J hooks and velcro straps like I have in the past is the way to go?
I'm curious to know if anyone has had similar experiences =]